PROJECT DESCRIPTION:
The project aims at design preparing conceptual , detailed design and construction drawings of Galalah Ultrafiltration Plant- with capacity of 40,000 CMD.
Technical Brief; the project consists number of building that includes UF Building, UF feed pumping station and other buildings
Date: May 2021
SCOPE:
TYPES OF ACTIVITIES: