The project’s aim is to prepare the design and technical office activities for Gates Development. The compound area is about 29 Feddan.
Date: October 2020
The Project includes:
- – Wet utilities: Water Supply, Sewage Drainage, Strom Drainage, Fire Fighting and Irrigation
- – Dry utilities : Medium voltage Power Supply, Low voltage Power Supply, Street lighting and Telecommunication
Scope of Services:
- Detailed Design
- Technical Office Activities
Types of Activities:
- Hydraulics
- Infrastructure
- Electrical