Project NameJapan University of Science and Technology
Client NameAl-Shoroukh Company, ENGINEERING AUTHORITY
LocationAlex, Cairo

Engineering Faculty 2


   The project aims at preparing the shop drawing of the electrical. Light current, HVAC  and other mechanical systems for Engineering Faculty 2.

• Technical Brief; each building consists of basement, ground floor with area of 5,000 m2 , first and second floor. The total built up area is about 12,000 m2.

• Date: 2018

Scope of Services:

  • Design review
  • Updating the design
  • Shop drawing

• Types of Activities:

  • HVAC
  • Plumbing
  • Electrical
  • Light current

Engineering Faculty 3


   The project aims at preparing the shop drawing of the electrical. Light current, HVAC  and other mechanical systems for Engineering Faculty 3.

• Technical Brief; each building consists of basement, ground floor with area of 5,000 m2 , first and second floor. The total built up area is about 12,000 m2.

• Date: 2018

• Scope of Services:

  • Design review
  • Updating the design
  • Shop drawing

• Types of Activities:

  • HVAC
  • Plumbing
  • Electrical
  • Light current

 


Engineering Faculty 4


  The project aims at preparing the shop drawing of the electrical. Light current, HVAC and other mechanical systems for Engineering Faculty 4.

Technical Brief; each building consists of basement, ground floor with area of 5,000 m2 , first and second floor. The total built up area is about 12,000 m2.

Date: 2018

• Scope of Services:

  • Design review
  • Updating the design
  • Shop drawing

Types of Activities:

  • HVAC
  • Plumbing
  • Electrical
  • Light current

 


Administration buildings


The project aims at preparing the shop drawing of the electrical. Light current, HVAC and other mechanical systems for Administration buildings.

• Technical Brief; each building consists of basement, ground floor with area of 3,500 m2 and 7 floors. The total built up area is about 15,000 m2.

• Date: 2018

Scope of Service:

  • Design review
  • Updating the design
  • Shop drawing

• Types of Activities:

  • HVAC
  • Plumbing
  • Electrical
  • Light current

 


COE buildings


The project aims at preparing the shop drawing of the electrical. Light current, HVAC and other mechanical systems for COE buildings.

• Technical Brief; each building consists of basement, ground floor with area of  and 3 floors. The total built up area is about 20,000 m2.

• Date: 2018

Scope of Services:

  • Design review
  • Updating the design
  • Shop drawing

• Types of Activities:

  • HVAC
  • Plumbing
  • Electrical
  • Light current