PROJECT DESCRIPTION:
The project aims at design preparing detailed design and shopdrawings for Lot 1 of Kiffa Potable Water Supply Project in Mauritania, under the authority of the Ministry of Hydraulics and Sanitation. The project will supply potable water to Kiffa from the Senegal River with capacity of 50000 m3/day. The project design basis considers raw water TSS up to 3,000 mg/L, with operational allowances reflecting high-solids conditions
Date: January 2026
SCOPE:
TYPES OF ACTIVITIES: