New capital city water treatment plant (nccwtp)-phase (1) 400,000 cmd

Project NameProject: New capital city water treatment plant (nccwtp)-phase (1) 400,000 cmd
Client Name New Urban Communities Authority/Administrative Capital For Urban Development
LocationThe New Capital, Egypt

PROJECT DESCRIPTION:

The project aims at design preparing conceptual and detailed design and detailed Engineering for NNEW CAPITAL CITY WATER TREATMENT PLANT (NCCWTP)-PHASE (1) with capacity of 400,000 CMD

Technical Brief; the project consists number of building that includes pumping station, settling, filtration and storage reservoirs

Contractor: Hassan Allam Construction (HAC)/Orascom JV

Date: September 2021

SCOPE:

  • Detailed Engineering
  • Detailed Design

TYPES OF ACTIVITIES:

  • Process
  • Hydraulics
  • Mechanical
  • Electrical
  • Instrumentation and control