The project’s aim is to produce a detailed design as well as shopdrawing of the Sewage Treatment Plant with Capacity of 6000 CMD for Port Said residential buildings area.
Technical Brief; the project consists of Preliminary, secondary and tertiary treatment to produce a treated sewage effluent for complying with landscape irrigation requirements. The secondary treatment was Advanced Sequencing Batch Reactor (ASBR)
Date: 2014-2015
Scope of Services:
Types of Activities: