PROJECT DESCRIPTION:
The project’s aim is the hydraulic analysis for the sewer
network and pumping station in addition to prepare the
tender documents for the required interventions that are required to handle the additional flow from the extension of the city. The city area is about 22,000 Fadden
The sewer lines with different diameter from 200 till 1800 mm
That will be discharged to the main limes 1110 & 1800 mm to Abo Rawash Waste water treatment plant
Date: December 2023
SCOPE:
TYPES OF ACTIVITIES: