The project aims at review the design of the treated sewage water transmission pipeline from hydraulic point of view.
• Technical Brief; Enieza Treated Sewage Transmission Line is used to transfer the sewage from Enieza WWTP to the disposal point (Lagoon and Wadi). The total length of the pipeline is 26 km.
• Date: 2017
• Scope of services:
• Types of Activities: