Enieza Waste Water Transmission Line

Project NameEnieza Treated Sewage Transmission Line
Client NameAl-Qassim Authority for water
LocationAl-Qassim, KSA

     The project aims at reviewing the design of the treated sewage water transmission pipeline from hydraulic point of view.

 Technical Brief; Enieza Treated Sewage Transmission Line is used to transfer the treated sewage from Enieza WWTP to the disposal point (Lagoon and Wadi). The total length of the pipeline is 26 km.

Date: 2017

Scope of services:

  • Design review

Types of Activities:

  • Hydraulics
  • Surge Analysis