Extension of Fetera WTP 35,000-70,000 CMD

Project NameExtension of Fetera WTP 35,000-70,000 CMD
Client NameAswan Water and Wastewater Company
LocationAswan, Egypt

     The project’s aim is to design and prepare the conceptual and detailed design of Extension of a water treatment plant of capacity 35,00070,000 CMD located in Aswan, Upper Egypt.

Technical Brief; the project consists number of building that includes Pipe intakes, pumping station, settling, filtration and storage reservoirs.

Date: August 2021

Project Overview: 

  • Process
  • Hydraulics
  • Mechanical
  • Electrical
  • Instrumentation and control
  • Structure
  • Architecture
  • Wet utilities
  • Landscape

Scope of Services:

  • Conceptual design
  • Detailed design
  • Detailed Engineering