The project aims at the structural design of the reinforced concrete box culvert of road number 9.
• Technical Brief; The plant capacity was 20000 m3/day and the source of water was the dam of Wadi Therad. Calriflocculator was used for flocculation-sedimentation process. The tasks were preparation of the tender documents.
• Date: 2011
• scope of services:
• Types of Activities: